Tower Construction Site Completed July 2001 - Slide 1
View of ice bridge from tower to Building
Transmission lines supported under ice bridge prevent damage from falling objects
Slide 2
View of Upper two thirds of tower - Note microwave dish towards Clewiston - Slide 3
Doug (WB4KGY) mounting transmission lines to cable ladder
Coax on far right will connect to FPAC switch cabinet - Slide 4
Site owner Jim (W4JBZ) working on tower lightning controller - Slide 8
1 5/8" air line to FM Transmitter and other transmission lines
to STL and Microwave equipment - Slide 9
5 KW Harris FM Transmitter - Slide 10
Equipment cabinets - On far left FPAC Switch - In center FM station accessory equipment
On right Harris 5 KW FM transmitter (99.5 mhz) - Slide 5
LEFT: Rear view of FPAC Switch Cabinet Upper view of cabinet including AC Power
Filter & distribution UHF duplexer
2 UHF & 1 VHF Motorola Mitrek radios
RIGHT: Upper view of cabinet including AC Power
LEFT: FPAC Switch Cabinet Top to Bottom: PolyPhaser lightning protector & 02 ground wire
Batteries - AC power filter &
distribution - UHF duplexer
2 UHF & 1 Motorola Mitrek radios
Computer & Monitor - 220 Radio Slide 7
Redundant switch mode power supplies
DC fuse panel & distribution
RIGHT: PolyPhaser lightning protector & 02 ground wire
.
|